Mr Sism
Drewe Bantick
- Joined
- May 23, 2013
- Messages
- 65
- Reaction score
- 34
Yet another classifier approach (apologies if this has already been covered). I like it! - could be handy for those who are highbanking material that is out of pump/hose-reach, would cut down on the trips back 'n forth if the rocks are screened out at the ore source. Great for river sluicing! Interested to hear if anyone has made one already or has a variation on the design.
[video=480,360]http://www.youtube.com/watch?v=IbHtJ_2aJjg[/video]
Drewe.
[video=480,360]http://www.youtube.com/watch?v=IbHtJ_2aJjg[/video]
Drewe.