Thanks Limpalot... great suggestions
I have 4 x 12v L.E.D strip lights I bought off fleabay cheap so will be using them later when I do the electrics.
Next week is painting, hook up the 12v water pump and plumbing cut and fold the aluminium for the tool box and get a mate to tig it up for me. Then start on the slide out kitchen, after that will be all the electrics.
Here is were I am at, at the moment.
Planning to build an aluminum tool box to put on the draw bar to house the electrics, i.e battery, 1000w converter charger/controller fuse box etc.
Also have to finish painting the outside.
I have a gas bottle holder , gerry can holder and stone guard to install at the front as well.
P.S..Bogger struts work ok with the load ,but we installed a prop to support the bed frame when fully open to minimise stress on the struts just in case.