Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Registered members
Current visitors
Charts
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Gold Prospecting
Do It Yourself (DIY) Projects
Miller Table (in progress)
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Prospecting Australia:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="joe" data-source="post: 3278" data-attributes="member: 175"><p>Thank you Jeff, for all you have done for me including the advise <img src="data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7" class="smilie smilie--sprite smilie--sprite1" alt=":)" title="Smile :)" loading="lazy" data-shortname=":)" /> I'm still at the early stage want to get the paint perfect before I glue my aluminium angles. Water supply will be independent or not fixed to the stone because of my engineering limitations (welding and bending aluminium) but keeping same principal as per your design. I will keep the progress going for others to learn from including test runs vid. Hooper box will have overflow back to secondary water tub as I'm afraid that if I don't get the correct number of holes right it may restrict my flow through the stone even if I have a valve control at the pump. The gate yes, I have Perspex in mind say 100mm in length 10mm in hight running 4-5mm above the stone parallel as you suggested that will be a gauge of my flow and creating the smooth environment, possible to hold cons and drip feed onto the stone at the same time.</p><p>Regards, joe <img src="data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7" class="smilie smilie--sprite smilie--sprite1" alt=":)" title="Smile :)" loading="lazy" data-shortname=":)" /></p></blockquote><p></p>
[QUOTE="joe, post: 3278, member: 175"] Thank you Jeff, for all you have done for me including the advise :) I'm still at the early stage want to get the paint perfect before I glue my aluminium angles. Water supply will be independent or not fixed to the stone because of my engineering limitations (welding and bending aluminium) but keeping same principal as per your design. I will keep the progress going for others to learn from including test runs vid. Hooper box will have overflow back to secondary water tub as I'm afraid that if I don't get the correct number of holes right it may restrict my flow through the stone even if I have a valve control at the pump. The gate yes, I have Perspex in mind say 100mm in length 10mm in hight running 4-5mm above the stone parallel as you suggested that will be a gauge of my flow and creating the smooth environment, possible to hold cons and drip feed onto the stone at the same time. Regards, joe :) [/QUOTE]
Verification
Post reply
Gold Prospecting
Do It Yourself (DIY) Projects
Miller Table (in progress)
Top