Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Registered members
Current visitors
Charts
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Gold Prospecting
Do It Yourself (DIY) Projects
Spray Bars for Highbankers
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Prospecting Australia:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="WalnLiz" data-source="post: 50766" data-attributes="member: 147"><p>G'day Pete,</p><p></p><p>I run 13 slots at 2cm intervals with a slot width of 13mm. I run a section of 25mm masking tape along the pipe and mark the two edges of the sluice so as to direct all the water onto the sluice only and not the sloped hopper. </p><p></p><p>After marking the sluice edge, i mark the 2cm guides and cut to the edges of the masking tape with a drop saw. You do lose a bit of pressure across the spray bar, but equal slots will work the best overall.</p><p></p><p>Cheers Wal.</p></blockquote><p></p>
[QUOTE="WalnLiz, post: 50766, member: 147"] G'day Pete, I run 13 slots at 2cm intervals with a slot width of 13mm. I run a section of 25mm masking tape along the pipe and mark the two edges of the sluice so as to direct all the water onto the sluice only and not the sloped hopper. After marking the sluice edge, i mark the 2cm guides and cut to the edges of the masking tape with a drop saw. You do lose a bit of pressure across the spray bar, but equal slots will work the best overall. Cheers Wal. [/QUOTE]
Verification
Post reply
Gold Prospecting
Do It Yourself (DIY) Projects
Spray Bars for Highbankers
Top