Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Registered members
Current visitors
Charts
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
General
General Chat
Analysis of Gold core and production reports
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support Prospecting Australia:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="Metamorphic" data-source="post: 132444" data-attributes="member: 3682"><p><strong>4m @ 7.46g/t Au from 113m incl 1m @ 18.2g/t Au </strong> (An example of testing on the Eastern side of the Highly Mineralized Zone they have discovered)</p><p></p><p>= a 4m length in the strike drill pattern obtained an assay result of 4.46 grams per tonne (what they would hope to get if they mined this section out).</p><p></p><p>The combined depth of these drill holes along this 4m stretch was 113m. (this would equate to an average drill hole depth of 28.25m if drill holes are spaced at 1m intervals)</p><p></p><p>A 1m section of this 4m length produced an assay result of 18.2 grams per tonne (a pay streak)</p><p></p><p>An average of 19.4 grams per tonne over the whole of the eastern zone section that was drilled and assayed.</p><p></p><p> <img src="data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7" class="smilie smilie--sprite smilie--sprite2" alt=";)" title="Wink ;)" loading="lazy" data-shortname=";)" /></p></blockquote><p></p>
[QUOTE="Metamorphic, post: 132444, member: 3682"] [b]4m @ 7.46g/t Au from 113m incl 1m @ 18.2g/t Au [/b] (An example of testing on the Eastern side of the Highly Mineralized Zone they have discovered) = a 4m length in the strike drill pattern obtained an assay result of 4.46 grams per tonne (what they would hope to get if they mined this section out). The combined depth of these drill holes along this 4m stretch was 113m. (this would equate to an average drill hole depth of 28.25m if drill holes are spaced at 1m intervals) A 1m section of this 4m length produced an assay result of 18.2 grams per tonne (a pay streak) An average of 19.4 grams per tonne over the whole of the eastern zone section that was drilled and assayed. ;) [/QUOTE]
Verification
Post reply
General
General Chat
Analysis of Gold core and production reports
Top